Simplified Processes and Ergonomic Execution
The KÜPS® Permanent System is designed for simple, safe, and cost-effective foundation works. By enabling primary injection during drilling, cased drilling is eliminated. The annular space between the ground and the support cladding tube is filled directly, followed by the complete secondary injection. This creates continuous double corrosion protection, even in the coupling areas.
Fewer devices, fewer conversions, and clearly structured work steps result in an efficient and clean on-site workflow.
Ergonomics and Sustainability in Daily Execution
Eliminating heavy casing significantly reduces physical strain on construction personnel. At the same time, logistics, material handling, and energy consumption are reduced. The system thus supports not only cost-effective execution but also sustainable and resource-conserving construction practices.