NEW: COMACCHIO MC 15 TX
When tunnel construction requirements become complex
In ground stabilization and ground improvement work during tunnel construction, precise drilling ahead of the tunnel face is critical. It stabilizes soil and rock masses and reduces the risk of settlement during excavation.
At the same time, a range of requirements must be taken into account, including limited space, varying drilling angles, and the use of different methods within a single project. Many drilling rigs are only partially suited to these conditions.
Maneuverability at challenging drilling angles
The COMACCHIO MC 15 TX was developed for applications where conventional drilling rigs reach their limits. The patented parallelogram kinematics enable flexible mast movements and precise alignment, particularly for horizontal and subhorizontal drilling.
At the same time, the drilling rig covers a wide range of applications in tunneling and special civil engineering. This facilitates work in areas where the drilling angle is critical and available space is limited.






